Search through titles, abstracts, authors, and keywords across all published volumes
The Distribution Generation (DG), which is a new member of distribution systems, enhances system performance. The DG improves voltage profiles, reduces real power loss, increases the system capacity and reliability. It is intended to boost the infrastructure in an environmentally friendly manner in comparison to Conventional power sources. Achieving the aforementioned benefits requires installing DGs of appropriate capacity in appropriate location. The ultimate goal of this work is to meet expected load demands for the next ten years in Alskerat (Misurata substation) by means of a photovoltaic (PV) DG system. While PVsyst software was used to identify the type and number of PV modules and inverters, and NEPLAN software has been used to analyze and simulate the work of the PV system. The current loads in the Alskerat power station are 18 MW and the expected loads for the next ten years will be approximately 38 MW calculated by load growth formula rate. The increasing of generating capacity of 20 MW was done by placing an electric power production station using renewable energies, which are the photovoltaic modules. The results of this attempt show an improved voltage profile of the grid and overcome to voltage drop problem while increasing load. From the results, the voltage drop that was addressed to the value 26.89 kV has been improved to a normal 30 kV after connecting the photovoltaic station. In addition, a cost-effect analysis in this work illustrates an advantage for PV systems over Conventional systems.
With the increasing development of smart devices and mobile phones in recent years, the demand for high transmission rates for wireless communication systems, especially cellular communication systems, has increased. And as we know that in order to raise the rates of information transmission in cellular systems, more spectral sources must be used, which in turn led to the widening of the transmission packet width for these systems. For this reason, the multi-carrier technology is a solution to the frequency selectivity problem that single-carrier modulation suffers from. In this paper, a MATLAB-based wireless and cellular network simulation tool and the use of object-oriented programming methods are used to study and simulate intercellular interference at multiple links in a new radio (5th generation) mobile phone system. Where the study was conducted by comparing two types of waveforms (CP-OFDM) and (FBMC), through both throughput, Bit Error Rate (BER), as well as the frame error rate (FER). The results obtained from the simulation showed that the waveform (FBMC) could be a more effective solution. It increases the throughput rate and reduces the bit error rate and frame error rate for the primary user compared to the OFDM waveform
This paper presents the use of circuit in plastic (CiP) as a new technology to develop a polycarbonate substrate microstrip patch antenna (PSMPA) for a fifth-generation (5G) system. The proposed compact PSMPA operates at a resonant frequency of 28 GHz and uses silver as a conductor instead of copper. The polycarbonate substrate has a thickness of 3 mm and a dielectric constant of 2.9. The inset feed technique is used as a feeding scheme to match the patch and the 50 Ω microstrip line. The proposed PSMPA structure has been simulated using Computer Simulation Technology (CST) Microwave Studio and its performance has been evaluated and compared with similar existing designs in the literature. The proposed PSMPA shows a return loss ( ) of -23.011 dB, bandwidth (BW) of 1.173 GHz, voltage standing wave ratio (VSWR) of 1.3560, gain (G) of 5.684dBi, and radiation efficiency (
Due to the rapid and significant development in building and construction projects, especially in developing countries such as Libya, and the accompanying increasing consumption of the basic material, which is cement, as the manufacture of this material accompanies a large consumption of energy. This study deals with the analysis of operational and design data as thermodynamic variables to assess the extent of utilization of lost thermal energy and the possibility of generating electrical power from it, thus reducing environmental damage. This research has studied and analyzed a model for recovering waste thermal energy from exhaust gases in Lebda Cement Factory for the purpose of generating electric power through the Rankin steam cycle, by utilizing two heat sources in the factory: the exhaust of the clinker cooler and the exhaust of thermal cyclones, where two heat exchangers were used: the first It is (SP- Boiler) that takes advantage of the high heat of the exhaust gases emitted from thermal cyclones and the second is (AQC- Boiler), which takes advantage of the heat of the gases resulting from cooling the clinker. This study analyzed the actual operational data collected from the factory control rooms and obtained through field visits to the factory. Through these obtained data, the energy balance was done on the heat exchangers used, the thermal energy of the steam generated in the Rankin steam cycle, and the analysis of the capacity and efficiency of the steam cycle using the Matlab program. Where the results showed that the power generated using this cycle is 9.014 MW, with an efficiency of 27.14%. In this work also, the effect of the steam temperature entering the turbine and the flow rate of the feed water on the thermodynamic performance rates represented in efficiency and capacity were studied.